Timeline & Installation Process

On-site assembly in 10 days after core delivery, with site preparation and foundation complete.

 From Consultation to Move-In: Mesocore’s Installation Timeline

How long does on-site installation take?

A Mesocore home can be assembled in 10 days after the core module arrives on-site, provided site preparation and the foundation are complete before delivery.

The core module arrives pre-wired, pre-plumbed, and pre-tested from the factory, helping streamline on-site installation.

The 10-day timeframe covers on-site installation. It does not include permitting, site preparation, foundation work, factory production, or transportation. Move-in timing also depends on completed utility connections and any required local inspections and occupancy approvals.

What are the steps?

  1. Prepare the land: Complete site preparation, confirm delivery access, and coordinate utility connections and foundation plans. Your general contractor handles permitting.
  2. Install the foundation: Complete the slab or pier foundation before the core module arrives.
  3. Deliver the core: The factory-built core module is transported as a 20-foot high-cube ISO-certified container by truck, rail, or ocean cargo, depending on the route.
  4. Assemble the home: Complete placement, using a crane if required, assemble the modular components, and connect utilities.
  5. Move in: Once installation is complete and required inspections and occupancy approvals are secured, the home is ready for move-in.

What can affect the timeline?

  • Permitting: Local requirements and processing times vary. Permitting can take weeks to months.
  • Site conditions: Truck access, utility proximity, and land-clearing requirements can affect preparation and delivery.
  • Weather: Factory construction reduces exposure to weather delays, but severe weather can still affect delivery and on-site installation.
  • Utilities and inspections: Connection schedules and required local approvals can affect the move-in date.