Skip to content
English - United States
  • There are no suggestions because the search field is empty.

Cost of a Mesocore ADU

Starting price of ADU

How Much Does a Mesocore ADU Cost?

ADU Investment Overview

A Mesocore Accessory Dwelling Unit (ADU) starts at $129,000 for the fully built unit.

Delivery and installation costs are additional and typically range from $20,000 to $45,000, depending on:

  • Site conditions

  • Property access

  • Utility connections

  • Foundation requirements

Final pricing is confirmed after a detailed site evaluation to ensure accuracy.


What’s Included in a Mesocore ADU?

Mesocore ADUs are designed as high-performance, premium living spaces—not builder-grade units. Standard features include:

Energy & Resilience

  • Integrated solar power system

  • Battery storage for backup power and energy efficiency

  • High-performance insulation and building envelope

Windows & Doors

  • Hurricane-impact–rated windows and doors

  • Energy-efficient glazing for comfort and durability

Interior Finishes

  • High-end cabinetry throughout

  • Premium interior finishes and fixtures

  • Thoughtfully designed layouts for modern living

Construction Quality

  • Precision factory-built construction

  • Engineered for durability, efficiency, and long-term value

(Exact specifications may vary by model and site conditions.)


Our Turnkey, White-Glove Process

Mesocore provides a fully managed, end-to-end experience. We handle:

  • Design and engineering

  • Zoning and permitting coordination

  • Manufacturing of the ADU

  • Delivery, installation, and final setup

Our goal is to make the ADU process simple, predictable, and stress-free.


Important Screening Note

Initial screenings evaluate space availability and delivery access only.
They do not confirm:

  • Zoning compliance

  • Setbacks

  • Permit approval

  • Final buildability

A more detailed analysis is required for confirmation.


Recommended Next Step: Site Feasibility Report

To determine whether an ADU can be approved and built on your property, we recommend completing a Site Feasibility Report.

What’s included:

  • Zoning and setback review

  • ADU placement constraints

  • Delivery and access considerations

  • Clear next steps

Cost: $199 flat fee
Turnaround time: 3–5 business days